ONGOING PROJECT Total floor area: 11,679m2 Address: DONG NAI Period: 06/2024-10/2024 DAEYEONG VINA - PHASE 2 대영비나 2차 프로젝트 Total floor area: 60,201m2 Address: VINH PHUC Period: 04/2024-03/2025 BH FLEX V2 E - FACTORY BH플렉스 - 전자공장 2024.06.222024.07.172024.07.312024.08.092024.08.152024.08.242024.09.072024.09.28 Total floor area: 32,089m2 (SITE AREA) Address: HAI PHONG Period: 01/2024-06/2024 SK TERRA - PILING/STRUCTURAL WORK SK테라 - 파일/골조 공사 Total floor area: 65,539m2 Address: BINH DUONG Period: 09/2023-09/2024 DRB VIETNAM 2ND FACTORY 동일고무벨트 베트남 2공장 2023.10.062023.11.162023.11.302023.12.212024.01.112024.01.252024.02.292024.03.142024.03.212024.04.172024.04.292024.05.292024.06.272024.07.112024.07.252024.08.152024.08.292024.09.122024.09.26
Total floor area: 11,679m2
DAEYEONG VINA - PHASE 2 대영비나 2차 프로젝트Address: DONG NAI
Period: 06/2024-10/2024