ONGOING PROJECT Total floor area: 42,499m2 Address: QUANG NGAI Period: 01/2026-11/2026 DN AUTOMOTIVE VINA FACTORY DN 오토모티브 비나 증축공사 Total floor area: 10,812m2 Address: BINH DUONG Period: 10/2025-05/2026 KOLON BTC-3 PROJECT 코오롱인더스트리 빈증 BTC-3 프로젝트 2025.09.162025.09.202025.09.262025.10.172025.10.182025.10.192025.11.122025.11.24 2025.11.282025.12.10 2025.12.172025.12.31 Total floor area: 35,366m2 Address: VINH PHUC Period: 03/2025-01/2026 DKT VINA FACTORY DKT 비나 신축공장 프로젝트 2025.07.022025.07.162025.07.302025.08.132025.09.102025.09.242025.10.082025.10.222025.11.192025.11.262025.12.10 2025.12.31
Total floor area: 42,499m2
DN AUTOMOTIVE VINA FACTORY DN 오토모티브 비나 증축공사Address: QUANG NGAI
Period: 01/2026-11/2026